Gutter forming machine
Model: HX- Gutter forming machine
WhatsApp:+86 18920395263
Payment: TT,30% deposit,70% balance before shipment
Voltage: 380V 50HZ 3Phase or according to customer’s need
- Description
- Inquiry
Description
Gutter forming machine
The gutter forming machine does not require much manual intervention. The worker enters the desired plate data in the computer controller and starts it with one button. The machine will automatically produce and cut automatically when the plate reaches the set length.
The cutting size has a small error range. After the cutting is completed, the worker can sort out the finished plate. The cutting section is neat and easy to install.

| No. | Main Parameter of gutter forming machine | |
| 1 | Suitable to process | Color alu-zinc steel coil/strips |
| 2 | Rollers | 18Rows |
| 3 | Dimensions | 8.5*1.2*1.3m |
| 4 | Motor Power | 5.5Kw |
| 5 | Pump Station Motor | 4Kw ,Brand Lichao,Shanghai |
| 6 | Thickness of the plate | 0.3mm-0.6mm |
| 7 | Productivity | 10-12m/min |
| 8 | Material of the cutting blade | Cr12,Quenched treatment 58℃-60℃With hydraulic cutting |
| 9 | Diameter of the roller | Φ70mm |
| 10 | Weight | About 6.2T |
| 11 | Main structure of the machine | 350 H steel |
| 12 | Processing precision | Within 1.0mm |
| 13 | Side panel of machine | 16mm |
| 14 | Chain Wheel and Cycle Chain | 1Inch |
| 15 | Voltage | 220V 60Hz 3phases |
| 16 | Control system | PLC control (Delta) |
| 17 | Frequency system | Delta |
| 18 | Drive mode | Motor drive |
| 19 | Touch screen | Delta |
| 20 | Rolling materials | 45# forging steel with chromium plate |
| 21 | Length Tolerance | ±2mm |
| 22 | Main Components | Manual decoiler(3T) 1setMain forming machine 1set Hydraulic cutting 1set Hydraulic station 1set PLC computer control cabinet 1set Supporter table 3Meters*2 |
Gutter forming machine Installation and training:
a.If buyers visit our factory and check the double layer galvanized tile roofing sheet making machine, we will teach you how to install and use the machine, and also train your workers/technician face to face.
b.Without visiting, we will send you user manual and video to teach you to install and operate.
c.If buyer needs our technician to go to your local factory, please arrange board and lodging and other necessary things.
After Service
a.One year guarantee for whole machine.
b.24 hours technical support by email or calling
c.If there is any problem found of the machine, we will repair it for free in one year.
Gutter forming machine packing and shipping :
1. Machine and uncoiler are nude packing (If you need, we can also packed it with water-proof plastic)
2. PLC control system and motor pump are packed with water proof paper,spare parts in carton box.
3.One set of machine needs a 40′ container to shipping.













